Current UTHealth Houston project resources for architects, engineers, and contractors
Contact [email protected] for further information.
Master Specifications and Design Criteria by Division
- Commissioning - Testing
- MEPF Drawing Details
- Division 00 - Procurement and Contracting Requirements
- Division 01 - General Requirements
- Division 07 - Thermal and Moisture Protection
- Division 09 - Finishes
- Division 21 - Fire Suppression
- Division 22 - Plumbing
- Division 23 - Heating Ventilating and Air Conditioning
- Division 26 - Electrical
- Division 28 - Electronic Safety and Security
- Division 33 - Utilities