| Buyer | Description | Close Date | Bid Number | Attachments | Contract End Date |
| Kelly Frappier |
Metro Dark Fiber Ring |
09/25/2018 | RFP 744-1827 | ||
| Michael Ochoa |
Grab-N-Go Food Services |
4/14/2017 | RFP 744-R1711 | ||
| LaChandra Wilson |
Executive Compensation Study and Ad Hoc Services |
08/03/2015 | RFP 744-R1523 | 10/15/2020 | |
| Laura Lander | Event Manager for Annual Fun Fest | 06/30/2015 | RFP 744-R1520 | 08/31/2020 | |
| Michael Ochoa | HCPC Unit 1D & 2B Renovation | 11/03/2015 | RFP 744-R1602 |
Appendix 2- Construction Standard Agreement Appendix 3- HUB Subcontracting Plan Appendix 6- 2013 Uniform General Conditions Appendix 7- Special Conditions |
12/2016 |
| Michael Ochoa | Landscape Maintenance Services | 11/13/2015 | RFP 744-R1603 |
Attachment A-Activity Schedule Attachment B- Overhead Facility Images |
01/2021 |
| Michael Ochoa | BBS Vivarium Construction | 09/22/2015 | RFP 744-R1521 |
Appendix 2- Construction Standard Agreement Appendix 3- Hub Subcontracting Plan Appendix 6- 2013 Uniform General Conditions Appendix 7- Special Conditions Addendum 2 Attachment A- Prevailing Wage Determination Houston Galveston Area |
10/14/2016 |
| LaChandra Wilson | Fundraising Campaign Feasibility Study | 01/21/2016 | RFP 744-R1607 |
Appendix Two- Sample Agreement Appendix Three- HUB Subcontracting Plan Exhibit A- Pricing and Delivery Schedule (Revised 01/08/2016) |
|
| Kimberly Elkins | English/Spanish Classroom Startup Kids | 12/16/2015 | RFP 744-R1605 |
Exhibit A- English Classroom Startup Kit |
04/03/2017 |
| Laura Lander | Intra-Arterial Vasospasm Trial Redesign | 01/14/2016 | RFP 744-R1608 | 01/31/2018 | |
| Michael Ochoa |
Elevator Modernization & Campus Wide Maintenance Services |
03/11/2016 | RFP 744-R1606 |
Exhibit 1- Scope of Work UCT Traction Elevator Modernization Specs Exhibit 2- Scope of Work MSB Traction Elevator Modernization Specs Exhibit 3- Scope of Work SPH Hydraulic Elevator Modernization Specs Exhibit 4-Scope of Work Campus Wide Maintenance Services Exhibit 5- Elevators Locations & Specifications Appendix 5- Disclosure of Interested Parties Questions & Answers- Section 6 *REVISED* |
|
| Laura Lander | MSB 1st Floor Infill | 03/15/2016 | RFP 744-R1610 |
Appendix 2- Owner's Standard Agreement Appendix 3- HUB Subcontracting Plan Appendix 4- Construction Manual and Drawings Appendix 5- Special Conditions Appendix 6- Uniform General Conditions |
09/29/2016 |
| Laura Lander | Emergency Child/Elder Care | 03/29/2016 | RFP 744-R1609 | ||
| Kimberly Elkins | Donor Acquisition Program | 04/19/2016 | RFP 744-R1616 | ||
| LaChandra Wilson |
Project Manager for Vivarium Management System Selection and Implementation |
04/15/2016 | RFP 744-R1613 | ||
| Michael Ochoa |
Security Guard Services |
04/20/2016 | RFP 744-R1611 | ||
| Chevonne Thornton |
MSB Lab AHU L-7 & L-8 Replacement |
04/25/2016 | RFP 744-R1615 |
Appendix 2- Owner's Standard General Contractor Agreement Appendix 3- HUB Subcontracting Plan Appendix 4- Drawings for AHU L7 and L8 Replacement Appendix 5- Specs for AHU L7 and L8 Replacement Appendix 6- 2013 Uniform General Conditions Appendix 7- Special Conditions REVISED Pre-Proposal Meeting Sign-In Sheet |
|
| Laura Lander |
Campus Solutions 9.2 Upgrade Partner |
05/05/2016 | RFP 744-R1617 | ||
| Michael Ochoa |
Health of Houston Survey |
06/03/2016 | RFP 744-R1618 |
Appendix 3- HUB Subcontracting Agreement Section 6- Pricing and Delivery Schedule *REVISED* |
|
| Michael Ochoa |
Food Services-HCPC |
06/10/2016 | RFP 744-R1614 |
Appendix 3- HUB Subcontracting Plan |
|
| LaChandra Wilson |
School of Nursing [SON] Roof Replacement |
06/27/2016 | RFP 744-R1619 |
Appendix 2- Owner's General Contractor Agreement Appendix 3- HUB Subcontracting Plan Appendix 5- Construction Project Manual and Drawings Appendix 6- 2013 Uniform General Conditions for Construction Contracts |
|
| Chevonne Thornton |
Financial Assurance Validation for HCPC |
07/20/2016 | RFP 744-R1620 | ||
| LaChandra Wilson |
Asbestos Abatement Services |
08/19/2016 | RFP 744-R1621 | ||
| Kimberly Elkins |
Campus-wide Automated E-911 System |
08/22/2016 | RFP 744-R1622 | ||
| Cleo Cueto |
Call Recording System |
08/26/2016 | RFP UPT-CRS | ||
| LaChandra Wilson |
HCPC Debt Collection Services |
10/07/2016 | RFP 744-R1623 | ||
| LaChandra Wilson |
Vivarium Management System Software & Implementation |
11/10/2016 | RFP 744-R1701 |
Appendix 2- Sample Service Agreement |
|
| Michael Ochoa |
MSB Switchgear and Generator Replacement |
11/15/2016 | RFP 744-R1702 |
Appendix 3- HUB Subcontracting Plan Appendix 6- Uniform General Conditions for Construction Projects Appendix 7- Special Conditions Exhibit A- Generator Replacement Drawings Exhibit B- Generator Replacement Specifications Exhibit C- Switchgear Replacement Drawings Exhibit D- Switchgear Replacement Specifications Mandatory Pre-Bid Meeting Sign-In Sheet REVISED Section 6- Pricing and Delivery Schedule Exhibit E- Corrugated Metal Panel Formation Exhibit F_SSAAddendum_1 Additional Switchgear Drawings and Specifications |
|
| Laura Lander |
HCPC Patient Units Renovations |
11/21/2016 | RFP 744-R1704 |
Appendix 2- Owner's Standard General Contractor Agreement Appendix 3- HUB Subcontracting Plan Appendix 5 A- Construction Project Drawings Appendix 5 B- Construction Project SPECIFICATIONS Appendix 6- 2013 Uniform General Conditions for Construction Contracts |
|
| LaChandra Wilson |
Consultant for Consortium on Aging |
12/08/2016 11AM |
RFP 744-R1707 | ||
| Michael Ochoa |
JOC Services |
12/16/2016 |
RFP 744-R1708 |
Exhibit A- Uniform General Conditions Exhibit B1- Special Conditions NEW Exhibit C- Sample Job Order Agreement Exhibit D- Sample HUB Subcontracting Plan Addendum 2 |
|
| Chevonne Thornton |
MSB First Floor Infill LRC 3 & 4 |
12/12/2016 |
RFP 744-R1705 |
Appendix 2 - Construction Standard Agreement Appendix 3- HUB Subcontracting Plan Appendix 5- Construction Project Drawings Appendix 6- 2013 Uniform General Conditions |
|
| Cleo Cueto |
Insurance Broker |
01/26/2017 |
RFP UTP-Insurance Broker |
Exhibit 2- 2013 Medicaid Provider App and Bond Exhibit 3- 2015 18 Crime Declaration and Endorsements Exhibit 4- 2016 Accident Declarations and Endorsements Exhibit 5- 2016 Flood Declarations Exhibit 6- 2016 Auto Declarations and Endorsements Exhibit 7- Cyber App Declarations and Endorsements Exhibit 8- 2016 DO Declarations and Endorsements Exhibit 9- 2016 Med Pro GL App Declarations and Endorsements Exhibit 10- 2016 Mgd Care EO App Declarations and Endorsements Exhibit 11- Property Declarations Exhibit 13- Safety Health and Environmental and Risk Mgmt Exhibit 14- UT Physicians 2015 FS FINAL Exhibit 15- UTP Income Statement- December 2016 Exhibit 16- UTP Clinic Survey Schedule FY17 Exhibit 17- 2017 UTP Locations 12 18 16 |
|
| Michael Ochoa |
Course Development |
01/31/2017 |
RFP 744-R1710 |
Appendix 3- HUB Subcontracting Plan Exhibit A- Governance and Approval Processes Addendum 1 |
|
| Laura Lander |
UCT Vertical Expansion |
02/02/2017 |
RFP 744-R1709 |
Appendix 2- Standard Agreement Appendix 3- HUB Subcontracting Plan Appendix 5- Uniform General Conditions |
|
| Kelly Frappier |
Magazine Printing Services |
03/03/2017 |
RFP 744-R1713 | ||
| Chevonne Thornton |
JJL Roof Replacement and Waterproofing Project |
03/09/2017 |
RFP 744-R1712 |
Appendix 2- (Sample) Standard Agreement Appendix 5- Project Manual and Drawings Appendix 6- General Conditions Appendix 7- Special Conditions |
|
| Laura Lander |
MSB Air Distribution 6th Floor |
04/25/2017 |
RFP 744-R1716 |
Appendix 2- Standard Agreement Appendix 3- HUB Subcontracting Plan Appendix 5- Drawings and Manual Appendix 6- Uniform General Conditions |
|
| Kelly Frappier |
English and Spanish Readiness Kits |
05/05/2017 |
RFP 744-R1718 | ||
| Michael Ochoa |
Shuttle Bus Services |
05/19/2017 |
Appendix 3- HUB Subcontracting Plan Appendix 5- Access By Individuals with Disabilities Appendix 6- Electronic and Information Resources Environment Specifications Appendix 7- Security Characteristics and Functionality of Contractor's Information Resources |
||
| LaChandra Wilson |
Laboratory Information System (LIS) and Data Migration |
04/27/2017 |
Appendix 3- HUB Subcontracting Plan Exhibit A- UTHealth Houston IT Security Standards Pre-Bid Sign-In Sheet |
||
| Chevonne Thornton |
Air Conditioning Systems TAB |
05/30/2017 |
|||
| LaChandra Wilson |
Valet Parking Services |
06/26/2017 |
Appendix Two- Sample Agreement |
||
| Michael Ochoa |
MSB L5 & L6 AHU Replacements |
06/21/2017 |
Appendix Two- Sample Agreement Appendix Three- HUB Subcontracting Plan Appendix Six- 2013 Uniform General Conditions Appendix Seven- Special Conditions Appendix Eight- Certificate of Interested Parties Exhibit 1- **REVISED** Section 6- Pricing and Delivery Schedule |
||
| Lauren Robert |
Answering Service |
6/23/2017 |
|||
| Michael Ochoa |
Audio Visual Implementation and Support |
07/26/2017 |
Appendix Two - Sample Agreement Appendix Three- HUB Subcontracting Plan Appendix Five- Access by Individuals with Disabilities Appendix Six- Electronic and Information Resources Environment Specifications Appendix Seven- Security Characteristics and Functionality and Contractor's Information Resources |
||
| LaChandra Wilson |
Fire Suppression Inspection & Maintenance Services |
07/19/2017 |
Appendix Two- Sample Agreement |
||
| Chevonne Thornton |
Integrated Pest Management Plan |
08/01/2017 |
Appendix Two- Sample Agreement |
||
| Michael Le |
HCPC Pharmacy Systems |
05/10/2017 |
|||
| Chevonne Thornton |
SPH Website Redesign |
08/23/2017 |
|||
| Laura Lander |
SPH MEP Upgrades |
10/03/2017 |
Appendix 2- Standard Construction Agreement Appendix 6- Uniform General Conditions |
||
| Lauren Roberts |
Reach Out & Read Book Program |
12/08/2017 |
|||
| Kelly Frappier |
Allscripts Sunrise Implementation Partner |
12/06/2017 |
|||
| Chevonne Thornton |
UCT AHU Replacement and Level 10 IAQ |
12/14/2017 |
Appendix 3- HUB Subcontracting Plan Appendix 5A- Drawings and Specifications AHU Replacement Appendix 5B- Drawings and Specifications Level 10 IAQ Appendix 6- 2013 Uniform General Conditions |
||
| Laura Lander |
IT Inventory System Programming Services- (ITAMS Rebuild) |
02/01/2018 |
Appendix Two- Sample Agreement Appendix Three- HUB Subcontracting Plan Attachment B- ITAMS Systems Architecture & Design Document Attachment C- ITAMS Policy and Procedures |
||
| Lauren Roberts |
UCT Expansion Interior Buildout |
02/15/2018 |
Appendix Two- Standard Agreement Between Owner and Contractor Appendix Three- HUB Subcontracting Plan Appendix Five- 2013 Uniform General Conditions for Construction Contracts |
||
| Chevonne Thornton |
Direct Mail Program Service |
03/08/2018 |
Appendix Two- Sample Agreement |
||
| Laura Lander |
Grant & Contract Management System Software Implementation Services |
03/09/2018 |
Appendix Two- Sample Agreement |
||
| Kelly Frappier |
UCT Switchgear Replacement |
03/13/2018 |
Appendix 3- HUB Subcontracting Plan Appendix 6- Uniform General Conditions Appendix 7- Special Conditions |
||
| Gabby Amaya |
Supply Mall Vendors |
04/10/2018 |
Exhibit A- Suppliers Top Items |
||
| Chevonne Thornton |
HCPC Patient Satisfaction Survey |
05/02/2018 |
|||
| Kelly Frappier |
MSB Air Distribution Floors 7 and 5 |
04/19/2018 |
Appendix 2- Sample Standard Agreement Appendix 3- HUB Subcontracting Plan Appendix 4- Air Distribution Drawings Appendix 5- Storm Pipe Drawings and Specifications Appendix 6- Uniform General Conditions |
||
| Chevonne Thornton |
Cyclotron Decommission |
05/15/2018 |
Appendix Two- Owner's Standard General Contractor Sample Agreement Appendix Three- HUB Subcontracting Plan Appendix Five- Ameriphysics UTHealth Houston Characterization Report Appendix Six- 2013 Uniform General Conditions for Construction Contracts Appendix Seven- Special Conditions |
||
| Laura Lander |
Campus Furniture and Office Moving Services |
06/06/2018 |
Appendix Two- Sample Agreement |
||
| Lauren Roberts |
MSB Penthouse AHU Replacement |
06/14/2018 |
Appendix 2- Construction Agreement Appendix 3- FY18 HUB Subcontracting Plan Form Appendix 4- Special Conditions Appendix 5- TMSB 1801 MSB Penthouse AHU Replacements Drawings & Specifications Appendix 6- CCW and Control Air Compressor Drawings & Specifications Appendix 7- Plumbing Piping and Equipment Drawings & Specifications Appendix 9- 2013 Uniform General Conditions Addendum 1- Penthouse AHU Replacements Final Phase DWGS & SPECS |
||
| Michael Ochoa |
UT Security Installs & Upgrades |
06/19/2018 |
Appendix 3- HUB Subcontracting Plan Appendix 5- Access by Individuals with Disabilities Appendix 6- Electronic and Information Resources Environment Specifications Appendix 7- Security Characteristics and Functionality of Contractor's Information Resources |
||
| Michael Ochoa |
Asbestos Management Services |
06/26/2018 |
Appendix Two- Sample Agreement |
||
| Kelly Frappier |
UTHealth Houston JJL MEP Replacement & 2nd Floor Renovation |
06/21/2018 |
Appendix 2- Sample Standard Agreement Appendix 3- Subcontracting Plan Appendix 6- 2013 Uniform General Conditions |
||
| Gabby Amaya |
Learning Management Systems |
07/02/2018 |
Appendix 3- HUB Subcontracting Plan Appendix 4- Access by Individuals with Disabilities |
||
| Michael Ochoa |
Housekeeping Services |
07/06/2018 |
Appendix 3- HUB Subcontracting Plan Appendix 5- Certificate of Interested Parties Exhibit One- Facilities Operations Exhibit Three- University Professional Building Exhibit Four- Child Development Center Exhibit Five- Student/Faculty Apartments Exhibit Six- Jesse Jones Library Building Exhibit Seven- Recreation Center Exhibit Eight- Harris County Psychiatric Center REVISED Exhibit Nine- UT Physicians Clinics Exhibit Ten- Floor Coverings REVISED |
||
| Lauren Roberts |
Catering Services |
07/12/2018 |
|||
| Gabby Amaya |
Simulation Lab Renovation |
09/05/2018 |
Appendix 2- Owner's Standard General Contractor Agreement Appendix 3- HUB Subcontracting Plan Appendix 5A- Construction Project Manual Appendix 5B- Construction Drawings Appendix 6- 2013 Uniform General Conditions for Construction Contracts Appendix 7- Special Conditions Sign-In Sheet- July 23, 2018 walk Addendum 1- Narrative with changed and drawings Addendum 2- Site Visit Information Exhibit A- Pricing & Delivery Schedule Sign-In Sheet August 3, 2018 walk Addendum 4- Deadline extension dates Appendix 8- Medical Equipment Construction Documents Addendum 5- Questions and Answers Addendum 5- SON 4th Floor RCP Security Notes Addendum 6- Deadline extension dates Addendum 7- UT System Division 1 Addendum 8- Questions and Answers (REVISED) Addendum 8- Level 4 Overall floor plan |
||
| Michael Le |
EHR/RCM |
09/05/2018 |
|||
| Lauren Roberts |
Faculty Performance Management System |
08/15/2018 |
|||
| Chevonne Thornton |
HCPC Answering Services |
11/15/2018 |
Appendix 2- Sample Agreement Between University and Contractor |
||
| Michael Ochoa |
JJL Library & Street Level Renovations |
12/04/2018 |
Appendix Two- Construction Agreement Appendix Three- HUB Subcontracting Plan Appendix Four- Certificate of Interested Parties Appendix Five- Uniform General Conditions Appendix Six- Special Conditions |
||
| Lauren Roberts |
Interior Painting Services |
3/21/2019 |
Appendix Two- Sample Agreement |
||
| Kelly Frappier |
Messaging Campaign |
04/01/2019 | |||
|
Laura Lander
|
SON Sim Lab A/V |
04/12/2019 |
Appendix 3 - HUB Subcontracting Plan Appendix 8 - Project Manual and Drawings Appendix 9 - Uniform General Conditions |
||
|
Michael Ochoa |
Grab-N-Go Food Services |
04/26/2019 | |||
|
Cleo Gonzales |
Telehealth |
11/13/2018 2PM |
|||
|
Lauren Roberts |
Architects |
05/14/2019 2PM |
|||
|
Lauren Roberts |
Mortuary Services |
05/15/2019 2PM |
|||
|
Lauren Roberts |
WorkLife Services |
05/16/2019 2PM |
Appendix 3 - FY18 HUB Subcontracting Plan Form |
||
|
Chevonne Thornton |
Financial Assurance Validation |
05/16/2019 | RFP 744-R1914 | ||
|
Michael Le |
EHR/RMC Strategic and Implementation Partner | 06/10/2019 | RFP 744- R1917 |
Appendix Two - Sample Agreement Appendix Three - HUB Subcontracting Plan |
|
|
Michael Ochoa |
Campaign Creative Services | 06/14/2019 | RFP 744- R1915 | ||
|
Kelly Frappier |
Dental Lab Service | 06/19/2019 | RFP 744 -R1916 |
Appendix Two - Sample Agreement |
|
|
Gabby Amaya |
Courier Services | 06/24/2019 | RFP 744- R1910 |
Appendix Two - Sample Agreement |
|
|
Cleo Gonzales |
P2P | 05/31/2019 | RFP 744 - R1913 |
Attachment B - Information Technology Questions Appendix Two - Sample Agreement Appendix Three - HUB Subcontracting Plan |
|
|
Gabby Amaya |
Blending Learning Solutions | 07/30/2019 | RFP 744- R1919 |
Appendix Two - Sample Agreement |
|
|
Ismael Rodriguez |
MDB Air Distribution Floors 1-4 | 08/02/2019 | RFP 744- R1920 |
Appendix Two - Owners Standard General Contractor Agreement Appendix Three - HUB Subcontracting Plan Appendix Five - 2013 Uniform General Conditions |
|
|
Kelly Frappier |
Mobile Health Services | 11/12/2019 | RFP 744- R2003 |
Appendix Two- Sample Agreement |
|
|
Chevonne Thornton |
GSBS Website Redesign |
12/03/2019 |
RFP 744- R2005 |
Appendix Two - Sample Agreement Exhibit A - UTHealth Houston Graphic and Editorial Standards |
|
|
Michael Le |
EHR/RCM Legacy System Support |
6/25/2019 |
RFP 744- R1918 |
Appendix Two- Sample Agreement |
|
|
Lorriann Rodriguez |
EDI Clearinghouse Partner |
10/09/2019 2PM |
RFP 744- R2001 |
Appendix Two- Sample Agreement Amended Appendix Three - Hub Subcontracting Plan |
|
|
Chevonne Thornton |
UTPB Valet Drive |
02/18/2020 2PM |
RFP 744- R2007 |
Appendix Two - Standard Agreement Appendix Three - HUB Subcontracting Plan Appendix Five - Drawings and Specifications Appendix Six - 2013 Uniform General |
|
|
Felix Gomez |
UTHealth Houston Advertising Campaign |
02/21/2020 |
RFP 744- R2008 | ||
|
Chevonne Thornton |
Student Billing Services |
03/05/2020 |
RFP 744 -R2006 |
Appendix Two - Sample Agreement |
|
|
Felix Gomez |
ServiceNow Implementation Partner |
04/03/2020 |
RFP 744 - R2011 |
Appendix Two - Sample Agreement |
|
|
Felix Gomez |
UTHealth Houston Neurosciences Campaign |
04/05/2020 |
RFP 744 - R2015 |
Appendix Two - Standard Agreement |
|
|
Felix Gomez |
Dental Lab Services |
05/15/2020 |
RFP 744 - R2013 |
Appendix Two - Standard Agreement |
|
|
Ismael Rodriguez |
UCT Emergency Light Code Compliance & LED Retrofit |
06/09/2020 |
RFP 744 - R2014 |
Appendix Two - Standard Agreement Appendix Three - HUB Contracting Plan Appendix Four - 2013 Uniform General Conditions for Construction Appendix Five - Special Conditions Sign-In Sheet |
|
|
Chevonne Thornton |
CIRCLE Pre-K Curriculum Materials |
08/03/2020 |
RFP 744 - R2017 |
Appendix Two - Sample Agreement |
|
|
Chevonne Thornton |
Federal Consultant |
7/30/2020 |
RFP 744 - R2018 |
Appendix Two - Sample Agreement |
|
|
Gabby Amaya |
Video Production Services |
07/26/2021 |
RFP Event #277 |
N/A |
|
|
Nancy Pesina |
Cloud Based Call Center |
12/21/2020 |
RFP Event #16 |
N/A |
|
|
Natalie Porter |
Auctioneering Services |
05/05/2021 |
RFP Event #156 |
N/A |
|
|
Chevonne Thornton |
CSON Website Redesign |
02/23/2021 |
RFP Event #41 |
N/A |
|
|
Chevonne Thornton |
AE Housing Phase 2 Shingled Roofs |
04/29/2021 |
RFP Event # 154 |
N/A |
|
|
Chevonne Thornton |
CIRCLE Curriculum Theme Library Materials |
05/20/21 |
RFP Event #202 |
N/A |
|
|
Gabby Amaya |
Background Check |
07/23/21 |
RFP Event |
N/A |
|
|
Natalie Porter |
Laundry/Linen Services (HCPC and DBSC) |
07/29/2021 |
RFP Event #242 |
N/A |
|
|
Natalie Porter |
Elevator Modernization & Campus Wide Maintenance Services |
06/30/2021 |
RFP Event #214 | ||
|
Ismael Rodriguez |
HMC to UCT Relocation |
11/19/2021 |
RFP Event #319 |
N/A |
|
|
Thao Ho |
Mobile Dental Van for UTHSC School of Dentistry |
11/04/2021 |
RFP Event #327 |
N/A |
|
|
Amy Lawrence |
Managed Hosting & Support |
1/14/2022 |
RFP Event #352 |
N/A |
|
|
Ismael Rodriguez |
UCT Garage Roof Repairs |
03/21/2022 |
RFP Event #393 |
N/A |
|
|
Ismael Rodriguez |
PHB 2100 – Public Health Education and Research Building (A/E |
02/25/2022 |
RFQ 744-Q2022 |
5.1 Draft Agreement Between the Board of Regents, UT System, Owner and Project Architect/Engineer 5.1.1 Anticipated A/E Agreement Provisions and ExhibitExhibit H Policy on Utilization Historically Underutilized Businesses 5.4 Owner Design Guidelines5.5 The University of Texas System Architect / Engineer Fee Schedule 5.6 UT Health Standard Specifications5.7 UT Health Guideline Technical Specifications 5.7 UT Health Guideline Technical Specifications |
|
|
Ismael Rodriguez |
PHB 2100 – Public Health Education and Research Building (CMAR) |
03/02/2022 |
RFQ 744-Q2201 |
5.1.1 Anticipated Contract Provisions for the CM Contract Exhibit H Policy on Utilization Historically Underutilized Businesses5.3 Owner’s Front End Documents 5.3.1 2013 Edition Uniform General and Supplementary Conditions for Building Construction Contracts for The University of Texas Systems (UGC)5.6 Texas Medical Center Architectural Standards Addendum 1 |
|
|
Ashish Patel |
Mechanical, Electrical, and Plumbing Services as needed |
03/17/2022 |
RFP Event #390 |
N/A |
|
|
Ashish Patel |
Operation and Management of Food Services |
03/18/2022 |
RFP Event #386 |
N/A |
|
|
Natalie Porter |
Learning Engagement and Management System |
03/24/2022 |
RFP Event #359 | Addendum 2 | |
|
Damon Soto |
WAN Services |
04/22/2022 |
RFP Event #394 | N/A | |
|
Krystle Sobh |
SIP Trunks |
04/06/2022 |
RFP Event #395 |
N/A |
|
|
Amy Lawrence |
TEPHI Website Branding |
04/18/2022 |
RFP Event #421 | N/A | |
|
Chevonne Thornton |
Asbestos Abatement Contractor |
05/19/2022 |
RFP Event #404 | Sourcing Supplier Training | |
|
Ashish Patel |
Job Order Contracts (JOC) |
05/27/2022 |
RFP Event #416 | N/A | |
|
Natalie Porter |
CLI-ECEP Contract Knowledge Exam Question Writing Services |
06/10/2022 |
RFP Event #434 | N/A | |
|
Liza Davignon |
Dental Handpiece Replacement |
06/01/2022 |
RFP Event #437 | Sourcing Supplier Training | |
|
Ismael Rodriguez |
SON Fire Alarm Panel and Field Device Replacement |
06/28/2022 |
RFP Event #448 | N/A | |
|
Amy Gradford |
Dental Inventory Supplies |
11/04/2022 |
RFP Event # 555 | N/A | |
|
Chevonne Thornton |
Fire Suppression, Inspection, and Maintenance Services |
01/10/2023 |
RFP Event #568 | N/A | |
|
Purvis Patel |
Direct Mail Program Services |
03/29/2023 |
RFP Event #585 | N/A | |
|
Chevonne Thornton |
CIRCLE Curriculum |
04/07/2023 |
RFP Event #589 | N/A | |
|
Purvis Patel |
Painting Services for Student Housing |
06/02/2023 |
RFP Event #608 | N/A | |
|
Damon Soto |
IT Cabling Services |
06/23/2023 |
RFP Event #643 | N/A | |
|
Ismael Rodriguez |
Campus Wide Security Equipment Installation and Programming |
06/26/2023 |
RFP Event #613 | N/A | |
|
Purvis Patel |
Laundry Services for Student/Faculty Housing |
06/26/2023 |
RFP Event #628 | N/A | |
|
Hector Jocobo |
HR Compensation & Market Analysis |
07/07/2023 |
RFP Event #619 | N/A | |
|
Kimberly Jones |
UTPB Garage 2nd Floor Waterproofing and Stripping |
06/29/2023 |
RFP Event #620 | N/A | |
|
Natalie Porter |
Digital Donor Wall |
10/04/2023 |
RFP Event #654 | N/A | |
|
Ismael Rodriguez |
MSB 2nd Floor Wet Lab Renovation |
01/17/2024 |
RFP Event #693 | N/A | |
|
Natalie Porter |
Student Recruitment Marketing Services |
02/12/2024 |
RFP Event #719 | N/A | |
| Purvis Patel |
Operation and Management of Food Services |
04/16/2024 |
RFP Event 746 | N/A | |
| Purvis Patel |
Laundry Services for Student / Faculty Housing |
04/10/2024 |
RFP Event 748 | N/A | |
| Toya Owens-Shepard |
Digital Media Buying |
06/19/2024 |
RFP Event 780 | N/A | |
| Jeannette Galo |
UTHealth Houston Translation Services |
05/30/2024 |
RFP Event 768 | N/A | |
| Ismael Rodriguez |
UCT Data Center Temperature Upgrade
|
06/05/2024 |
RFP Event 765 | N/A | |
|
Purvis Patel |
Recreation Center Pool chemicals & Services |
07/05/2024 |
RFP Event 795 | N/A | |
|
Nancy Pesina |
CIRCLE Pre-K Theme Libraries |
07/15/2024 |
RFP Event 785 | ||
|
Carolyn Minor |
CLI CIRCLE Print Production Management & website development Services |
07/12/2024 |
RFP Event 793 | ||
|
Purvis Patel |
SRB 305 and 306 Warm Cell Lab Buildout Renovation |
11/19/2024 |
RFP Event 860 | ||
|
Purvis Patel |
University Housing Apartment Cleaning Services |
11/21/2024 |
RFP Event 877 | ||
|
Vincent Huynh |
Department of Pathology & Gulf States Hemophilia- Courier Services |
07/24/2024 |
RFP Event 787 | ||
|
Nancy Pesina |
Mortuary Services |
11/25/2024 |
RFP Event 869 | ||
|
Purvis Patel |
Shuttle Bus Transportation Services |
02/13/2025 |
RFP Event 880 | ||
|
Natalie Porter |
Work life & EAP back up phone coverage services |
03/19/2025 |
RFP Event 932 | ||
| Nancy Pesina, Kimberly Jones |
Campus Bookstore |
04/14/2025 |
RFP Event 741 | ||
| Vincent Huynh |
Neutral Archive |
04/14/2025 |
RFP Event 955 | ||
| Purvis Patel |
Mobile Clinic Trailer Unit |
04/21/2025 |
RFP Event 968 | ||
| Chevonne Thornton |
OCB Main Service Switchboard Replacements |
06/03/2025 |
RFP Event #991 | ||
| Chevonne Thornton |
UThealth Houston HCPC Revitalization |
07/30/2025 |
RFP Event #1000 | ||
| Chevonne Thornton |
UTHealth Houston JJL 3RD Floor Renovation |
07/25/2025 |
RFP Event #1030 | ||
| Purvis Patel |
MSB 3.518 Open Wet Lab Renovation |
12/05/2025 |
RFP Event #1064 | ||
| Damon Soto |
Oracle Fusion Cloud ERP Implementation |
04/10/2025 |
RFP Event #1114 |
||
| Ismael Rodriguez |
Public Health Building Laboratory Equipment Move |
05/06/2026 |
RFP Event #1112 |
||
| Purvis Patel |
Campus Wide Elevator Maintenance Services |
05/29/2026 |
RFP Event 1122 |
-
Schools
The Seven Schools of UTHealth HoustonExplore our schools.
-
Students
Current StudentsFuture Students
-
Patients
Patient CarePatient care for all your needs.UT Physicians
The clinical practice of McGovern Medical School at UTHealth Houston
School of DentistryThe clinical practice of UTHealth Houston School of Dentistry
UT Health ServicesThe clinical practice of Cizik School of Nursing at UTHealth Houston
-
Research
Research at UTHealth HoustonResearch Offices
-
Give
Philanthropy at UTHealth HoustonHelp improve the health of our communities.